1. Check the track parts in order to assemble the track on the floor before the installation of the movable partition.
2. Mark the rail line and place the brackets in the specific location.
3. Install the rail brackets on the ceiling.
4. Check if the mobile partition is firmly fixed on the track. When the track and brackets must be stored loosely in the storage area so that the bracket sheets can be moved to other locations.
5. At the end, measure the proper position of the storage rails before adjusting the main rail facility. This is very important for crosspoint placement.
Track adjustment.
1. Remember that the track is loose enough over all bays. Ensure track stopping time.
2. Tighten all track connections and adjust the track level correctly, the track installation direction must also be horizontal and straight.
3. In the installation of track facilities, for sound insulation and mineral wool is necessary for the installation of the sheet.
4. The track has "L", "T" and "ten" barges, which are used for the connection of the steering, and there are left and right points. L and T are trimmed to the appropriate size and marked with numbers to indicate their position.