Nowadays, some oversized meeting halls, or banquet halls will always look empty, even if the arrangement is very compact or will lack a sense of security, such as when we talk in this type of place the sound will be very noisy always feel uncomfortable, then it is very necessary to a wall will be active and convenient to solve this problem, then we use the movable partition will be a good solution to this problem, it has a better It has a better sound insulation effect will seem quiet and elegant, it can also be divided into play places and eating places and other areas. But how to install the movable partition, let us and Egood partition Xiaobian to learn about it.
Movable partition installation method
1, in the installation of movable partition door, the first thing we have to do is to look at the construction environment, to the site to survey the construction environment is certain, survey the construction environment is the main purpose is to determine the site does not have the installation conditions, record the location of the roof beam, the location of the air conditioning duct system, etc. to customize the final construction program. The most suitable time for construction is the site before any renovation.
2, then we need to do is to measure, positioning, in accordance with the construction drawings, in the indoor ground to put out the location of the active partition control line, and to partition wall location line led to the side wall and the top plate. When the line should be popped out the installation position line of the fixed parts. The installation height of the track must be discussed with the installation of the ceiling construction team, otherwise it will cause a lot of trouble.
3, steel structure and track fixings installation is the next thing we have to do, because the steel structure is a load-bearing structure connecting the roof and track, the steel structure involves the safety of the entire movable partition system, so never take it lightly. According to the construction drawings in the roof of the building to play pull burst screws, and then the angle iron welding fixed. Select the track fixings according to the design requirements. Before installing the track to consider the wall, ground, ceiling closure practices and facilitate the installation of movable partition walls.
4, the track has "L" "T" "ten" barge, for turning the connection, there are left and right. L and T are trimmed to the appropriate size and marked with numbers to indicate their location.