Jan 04, 2023

The installation process of movable partition

Leave a message

I. Installation of track facilities.
1. When the partition is dangling on the track, the escape exit track can be removed without rebuilding the crane.
2. For escape exit track must be special bracket track connection.
3. The installation of the track should be constructed according to the accurate information of the adjustment at the time of measurement.movable partition

II. Track adjustment.
1. Remember that the track is loose enough above all brackets. Ensure the track stopping time.
2. Tighten all track connections, correct adjustment of track level height, track installation direction must also be horizontal and straight.
3. In the installation of track facilities, for sound insulation and mineral wool is necessary for the installation of panels.

4. The track has "L" "T" "ten" barge, for the steering connection, there are left and right. L and T are trimmed to the appropriate size and their positions are indicated by numerical marks.

 

  7

  8

  9

Send Inquiry