Process of movable partition
1、According to the customer's site and requirements, the best design plan and quotation.
2. The customer confirms the design and quotation.
3. The factory will send the strictly built raw mouth (professional import and export mechanism for loading and unloading of the screen), elbow (special component for the bending angle of the screen rotation) and professional track and related accessories, such as four-sided steel plates, through pins, wire rods, special nuts, angle codes, etc. to the installation site.
4、After the technician enters the site, he will put the line at the site according to the drawing and start to install the track after confirmed by the customer. (The road rail will be reinforced with national standard angle steel from the ceiling top hitting the pull-out screw burnishing, the road rail will be connected with the appropriate distance burnishing angle code and road rail, so that the road rail bearing force to achieve the best effect.)
5. after the installation of the track, technical personnel measured the site height, width headroom size and confirmed by the customer.
6. Professional designers design the door panel according to the site.
7. The factory makes the door panels according to the drawings provided by the professional designer.
8. The door panels will be transported to the installation site after being strictly tested and qualified by the quality inspection department of the factory.
9. Hanging the door panels after the customer's approval by random inspection.
10、Training customers to use the movable partition skillfully.